Item Description P/N Q.ty(1) Note
1 Bolt QS00006025808C 7 M6*P1.0*25L
2 Bolt QS00006030808C 1 M6*P1.0*30L
3 Washer QS101061201000U 3 φ6.5*φ12*t1
4 Asm., Head Cover QS1231069T0 1
5 Gasket , Head Cover QS39169S000 1
6 Nut QS0220600000C 2
7 Stud QS00106115800C 2
8 Bearing, Ball QS1006002000000 1
9 Pin, Dowell QS47569S000 2
10 Seat, Valve, Spring, Outer QS77569S000 8
11 Seal, Valve QS20962B000 4
12 Clip, Retainer QS78169S000 8
13 Spring, Valve, Outer QS75169S000 4
14 Retainer, Valve, Spring QS77169S000 4
15 Pin, Dowel QS30108080 4
16 Cover, Head , RH QS33169S000 1
17 O-Ring QS21600725 1
18 Bolt QS00006020808C 1 M6*P1.0*20L
19 Gasket, Cam Cover QS33269S000 1
20 Bearing, Ball QS10060000Z00C3 1
21 Bolt QS00006012808C 1 M6*P1.0*12L
22 Plug, Spark QS9807650N000 1
23 O-Ring QS21004320 1
24 Insulator, Cylinder head QS11269S000 1
25 O-Ring QS21004330 1
26 Asm., Manifold, Intake QS1710069N000 1
27 Strap QS52004064 2
28 Adapter, Carburetor QS14636I000 1
29 Nut QS0500600000C 2 M6*P1.0
30 Stud QS00106040800C 2 M6*P1.0*40L
31 Bracket, Brake Switch QS465202000 1
32 Valve, Intake QS71169S000 2
33 Valve, Exhaust QS72169S000 2
34 Cylinder Head Comp QS1220769E0 1
35 Stud QS001080468C 2
36 Gasket Set QS1225069S001 1
37 Cylinder QS10069S000 1
38 Bolt QS00006030808C 2 M6*P1.0*30L
39 Gasket, Cylinder QS19169S000 1
40 Pin, Dowel QS30110140 2 φ10*14L

Q.TY(1) = Quantité minimale requise